Save money while saving the planet, with Mondatum

Our server hosting and capacity on-demand facility is located at a Waste to Energy power station which supplies us directly with low-cost electricity

Our server hosting and capacity on-demand facility is located at a Waste to Energy power station which supplies us directly with low-cost electricity

As concerns for the climate and the future of the planet grow, companies are looking for ways to reduce their carbon footprint.

Green initiatives to reduce power consumption include using more power-efficient hardware and connecting both new and legacy equipment to cleaner, more efficient energy sources. These initiatives will naturally preclude the use of conventional air-conditioned server hosting environments.

We have teamed up with a multinational green energy producer and one of the world’s largest suppliers of computer hardware to create Mondatum’s first clean, green server hosting and capacity-on-demand facility on an unglamorous industrial site.

Located at an out-of-town plant generating environmentally friendly power, we are able to offer our customers the lowest-priced reliable source of green power in the UK. We use the National Grid as a back-up for maximum resilience.

Unlike conventional data centres, our modular hosting environment is free-air cooled and our high power density racks are optimised for high performance computing. 

Expansion capacity is available as a consumption-based, OpEx-only resource, ideal for base-load

Contact Colin Birch our CEO for more information and to receive a copy of our White Paper - colin@mondatum.com and +447990 758246.